-
BNSF Crawford Hill
Name of Route: BNSF Crawford Hill (for MSTS)
Version and Release Date: 1 (January 12, 2003)
Description: A fully detailed prototypically accurate recreation of 25 miles of BNSF's Butte Sub in Western Nebraska, featuring double track coal operations on mountain grade with helpers.
Installation Method: Self-Installer. Requires all 6 default routes.
Size of Download: 44 MB.
Size of Installed Route: 122 MB.
Fantasy, Prototypical, or Freelance Operations: Prototypical.
Freight or Passenger: Freight.
Era or Genre: September 27, 2001.
Location: Western Nebraska.
Length of Mainline: 25 miles.
Length of Branches: n/a
Number of Branches: 0
Number of Sidings: 1
Number of Yards: 1 small yard
Mixture of Dual and Single Track: 2 main track CTC
Level of Trackside Detail: Complete - accurately placed from prototype
Amount of Scenery Completed: Fully completed.
FPS Specs, with qualifiers: Demanding
Activities Provided: 3 activities for default equipment.
Non-Default Consists or Rolling Stock Required in Activities: None.
Add-In Track Sets: None.
Tsection.dat file used: Default tsection.dat.
Payware or Freeware: Freeware.
Known Problems:
In some activities the speed restrictions between mp 412.8 and 414.1 on both mains do not consistently apply.
Where it can be downloaded: Train-Sim.com.
Extra Information: Manual in pdf format.
__________________________________________________ ___________
Submitted by John Stanford - dem_ex@hotmail.com
__________________________________________________ ___________
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules