Announcement

Collapse
No announcement yet.

UP-Gila Sub

Collapse
X
Collapse
First Prev Next Last
 
  • Filter
  • Time
  • Show
Clear All
new posts

    UP-Gila Sub

    Yes, it's time for another small route project.... A rather large chunk of the AZ portion of the Sunset Route, inspired in part by Jean's DIYRB route but a little closer to one of several places we've called home over the past [really big number] years.



    Current plan is to work westward from Tucson in ~40 mile phases:

    Phase 1: Tucson to Picacho (SP988-SP937)
    Phase 2: Picacho to Maricopa (SP937-SP897)
    Phase 3: Maricopa to Gila Bend (SP897-SP856)
    Phase 4: Gila Bend to Aztec (SP856-SP810)
    Phase 5: Aztec to Wellton (SP810-SP770)
    Phase 6: Wellton to Yuma (SP770-SP734)

    Phase 7: Picacho to Florence
    Phase 8: Florence to Magma Jct
    Phase 9: Magma to Phoenix

    Demex has already been pulled for the entire route, and markers for Phase 1 are about 50% complete. As I mentioned in another thread, my son will be working with me on this -- with luck, I hope to "only" be laying track and some occasional scenery object building.

    But, as with other projects, if someone has an attachment to this route and wants to help out, by all means feel free to speak up.

    I can say that the last three phases are the ones which concern me the most --- Magma to downtown Phoenix is a pretty dense urban setting, and as I've found with doing Milwaukee and Chicago, they're extremely time consuming.

    Tucson? Not so much density to deal with. The UP runs along I-10 for most of Phase 1, and the short section thru downtown Tucson is pretty tame in comparison.

    The other major decision I'm struggling with is how far to backdate the route ---- UP is double-tracking the entire sub, and is probably more than 50% complete.
    Last edited by eric; 04-03-2012, 00:33.
    If you like what you see here at Trainsim.com, be it the discussions and knowledge in the forums, items saved in our library or the ongoing development of our TSRE Fork, I hope you'll consider a paid membership to help support keeping the site operating.... Thanks!

    #2
    Sounds like a fantastic plan to the ears of this fan of the sunset route! Depending what you need help with, count me in. I'd definitely be more than willing to mosaic the heck out of it for ya.

    Comment


      #3
      Depending on the era you intend to model, and your curiosity, this is a great thread to read through:

      Trains magazine offers railroad news, railroad industry insight, commentary on today's freight railroads, passenger service (Amtrak), locomotive technology, railroad preservation and history, railfan opportunities (tourist railroads, fan trips), and great railroad photography.

      Comment


        #4
        Originally posted by jovet View Post
        Depending on the era you intend to model, and your curiosity, this is a great thread to read through:

        http://cs.trains.com/TRCCS/forums/t/...px?PageIndex=1
        Yes, I've been following that discussion for over a year. Hadn't looked recently, and just realized I'd forgotten to share an update...
        If you like what you see here at Trainsim.com, be it the discussions and knowledge in the forums, items saved in our library or the ongoing development of our TSRE Fork, I hope you'll consider a paid membership to help support keeping the site operating.... Thanks!

        Comment


          #5
          I would say go with a modern version.. Then if somebody wants to, or you get the desire to, you can always backdate and rip out the double track.. Also, I wouldn't mind working on it but my contribution would be rather slow...
          Don't tell me the sky's the limit, when there's footsteps on the moon..

          --Josh--

          Comment


            #6
            It's your choice, but I'd go with an era that has similar track for both Southern Pacific and Union Pacific ownership.
            Nick - Creator of the Virtual Railroading Review Show
            sigpic

            Comment


              #7
              I also agree with the UP and SP era. Because it is much more easy to update a route to modern times than to backdate it to an older era. Backdating is much more time consuming because of the increasing of the station and yard layouts and placing of buildings like depots etc.. I speak out of experience that bringing it back from double track to single track is very difficult and cost you a lot of crashes in the RE, but strange enough the opposite way is easier (single to double)! That is why I advise to build first the older era!!!

              Vincent

              Comment


                #8
                Originally posted by jrossi
                I would have to agree with "Train-a-Mania" about using the "SP and UP Track Era".
                I also agree with the suggestion that you use an era with similar track. I especially want to run Sunset Limiteds and Golden States.

                John DeLamater

                Comment


                  #9
                  A very delayed update.... but no, this project isn't dead. Yet.

                  After a lot of thought and consideration.... I'm going with present day, mainly because that's what I have the imagery and documentation for.



                  As of this week, the Phase 1 trackwork is about 50% done. I've got the track alignment complete from CP Cherry Avenue (SP985) up to SP954, just short of CP Red Rock. Cherry Ave is just west of the main Tucson yard, and also where the Nogales Subdivision turns to the south.



                  The first 15 miles between Cherry Ave and what will soon be CP Sabino (under construction) in Marana will likely be the most complicated sections in terms of scenery, as it will involve downtown Tucson, I-10, and all the other fun that comes along with building in an urban area.

                  Last edited by eric; 04-03-2013, 15:49.
                  If you like what you see here at Trainsim.com, be it the discussions and knowledge in the forums, items saved in our library or the ongoing development of our TSRE Fork, I hope you'll consider a paid membership to help support keeping the site operating.... Thanks!

                  Comment


                    #10
                    With the Gila, I'm trying something a little different... Track is stretching across 34 tiles right now, but rather than plow ahead with track, I'm focusing on scenery and roads over a six tile section, which is admittedly a little more than what some folks would suggest (e.g. 1-2 miles), but could potentially knock out a third of my urban scenery... There are quite a few big-box stores for that stretch, and many, many fast food chain small-boxes... Yes, I know there are some of each already in the file library...

                    Orange Grove Road


                    Ina Road


                    Cortaro Road




                    Note the unusual power lines... yes, there's a third line running thru the center of the tower. I've only seen these along this stretch of highway...
                    Last edited by eric; 04-07-2013, 03:48.
                    If you like what you see here at Trainsim.com, be it the discussions and knowledge in the forums, items saved in our library or the ongoing development of our TSRE Fork, I hope you'll consider a paid membership to help support keeping the site operating.... Thanks!

                    Comment


                      #11


                      Progress continues... I've got a growing amount of scenery, primarily between Orange Grove and Cortaro Road, and that's required quite a bit of work in Sketchup to fill in the urban background.



                      It's also requiring some degree of patience with doing power lines & wires, as there are high-tension wires which parallel the ROW for most of the way down from around CP Rillito to CP Stockham.



                      I did break with the "work on the urban tiles" over this past week... I didn't have a lot of patience for Sketchup, so I roughed in track from the west end of CP Sabino all the way up to the east end of CP Picacho. I still will need to go in and do the crossovers & sidings, but with the rough alignment done, I won't have to worry about the alignment as closely as I add in roads & scenery.

                      Saguaro Power Plant (near Red Rock)


                      CalPortland Cement Plant (near Rillito)



                      Mount Lemmon in the background... thanks to extended DM's in Open Rails:

                      Last edited by eric; 04-21-2013, 23:38.
                      If you like what you see here at Trainsim.com, be it the discussions and knowledge in the forums, items saved in our library or the ongoing development of our TSRE Fork, I hope you'll consider a paid membership to help support keeping the site operating.... Thanks!

                      Comment


                        #12
                        Looking Good
                        A RR Mad Lip: It's Better Not 2 Show un Finished work when the work isn't Complete Proudly then getting let down about it When Posting & telling as it's Boldly Not SaFe 2 Urr Progress or Suportive Parents as it is to Post Regularly Round. Stay.Secretly.Working. & it will Keep it Civil and Safe from Gimme Pigs & Strike Downers

                        Comment


                          #13
                          This is an interesting project of yours, Eric, and I had not paid enough attention to the scope of the line itself .

                          Phoenix, itself, has my interest in particular, as if I recall correctly, one of Bob Wirth's Route does enter into Phoenix, and perhaps like others, this left me wanting for more !...'-)

                          Phoenix, also, as the ( modern ) downtown part, has received phenomenal coverage , as far as the ( Google ) Sketchup 3D warehouse , almost block-by-block, to such an extent someone may even want to start a route ( real-life or fictional ), starting with Phoenix itself .

                          Interesting timing for me reading some further follow up, as I did design and tested placement of some UP mileposts, with the vertical positioned numbers, over the weekend .

                          I will definitely keep this project of yours in mind, whenever I share some stuff from my end of things ...'-)

                          Jean Brisson Route Builder

                          Comment


                            #14
                            Love the progress shots!!

                            Looking forward to this one because I am LONG overdue to run another U.P. Route and I have a gang of locos ready to run.
                            Don Newman, Jr.

                            Comment


                              #15
                              Looks Great. This route is something that my wife Christina and I railfan once/twice a month. Keep up the great work!
                              ---
                              Jeffrey Rossi
                              http://railfan.myteggypc.com

                              Comment

                              Working...
                              X