Announcement

Collapse
No announcement yet.

L&N Knoxville Division, complete

Collapse
X
Collapse
First Prev Next Last
 
  • Filter
  • Time
  • Show
Clear All
new posts

    L&N Knoxville Division, complete

    Colleagues,

    About 18 months ago, I released a route, started by Dudley Evans, which covered the KD Division (now subdivision
    of CSX) from Corbin, KY to Knoxville. I included a little SR along with it. Now I am working on an expanded version
    of that route which covers Corbin, KY to Etowah, TN which was the entire length of the Knoxville Division, i.e. the KD
    line. This is now the KD subdivision of CSX. I have fleshed out the SR line to include Harriman Jct. to Clinton to
    Knoxville which I released as separate route a decade or so ago and a little bit of the Hook & Eye line and the Etowah
    to Atlanta line just so activities could start "off stage". I am also including Clinton to Jellico to the ARCO coal mine.
    This latter location opened in 11/67 and one of the first movements to the ARCO mine was a test train consisting of
    some "F" units and the R-1 geometry car which I managed. Arco produced a unit train of coal every few days until
    the early 1990s and the line up Tackett Creek is now abandoned. Some other branches and the Knoxville to
    Middlesboro, KY line are included. Earlier in 2022, Clinton to Fonde, KY and Knoxville to Middlesboro were leased
    or sold to R. J. Corman and now form two Tennessee lines of that company.

    Look for release late in 2022 or early 2023.

    J. H. Sullivan, P.E.
    retired from CSX & SR
    docent, C&TS RR

    #2
    Outstanding!

    Comment


      #3
      Awesome! Glad I stumbled on this post, I will be on the lookout for that route.

      Comment


        #4
        More

        Originally posted by RS5T_RRO View Post
        Awesome! Glad I stumbled on this post, I will be on the lookout for that route.
        I'll never see 83 again, so I am trying to discipline myself to produce routes that are usable & reasonable as
        to detail when downloaded. Then I give blanket permission for anyone to flesh out more detail if they wish and just
        footnote me as the original creator.

        Probably the hardest part of creating a route for me is ROADS. They hardly show at all when selected and we only
        have a limited amount of curves, junctions, etc. so I wind up creating roads that would not stand the test of a close
        inspection by a local resident, but which are functional. The Divided freeways are the biggest pain as you cannot just
        use the "Y" key to sculpt around them. That leaves undesired peaks or holes in the median which have to then be
        tweaked individually. This route includes several of those.

        J. H. Sullivan
        aka landnrailroader

        Comment


          #5
          Empties at ARCO

          The attached image is what the engineer sees when he gets close enough to the ARCO mine to
          see the machinery etc. What surprised me after I had detailed this location and then took this
          look is just how close it is to the real view.

          Over the period of 11/67 to 8/78 I tested the track to this mine several times as a Southern Rwy.
          employee on the track geometry car which I was responsible for. So, been there, seen that, and
          now it just looks right-----.

          A few hundred meters further into the left side of the loop I have removed a 10m track piece so
          as to avoid loop issues that MSTS does not like. Once it is released a user can easily replace
          this piece, and another at the Kingston Steam plant if they wish - and at their own risk. The
          CSX units are "leased" by NS-----. I need a few more details for the mine too. This was not a
          shaft mine and most of the coal was trucked to this point from stripping locations up to 5
          miles away.

          J. H. Sullivan
          (landnrailroader)Click image for larger version

Name:	ARCO-08-06.jpg
Views:	1
Size:	204.6 KB
ID:	2204197

          Comment


            #6
            Originally posted by landnrailroader View Post
            The attached image is what the engineer sees when he gets close enough to the ARCO mine to
            see the machinery etc. What surprised me after I had detailed this location and then took this
            look is just how close it is to the real view.

            Over the period of 11/67 to 8/78 I tested the track to this mine several times as a Southern Rwy.
            employee on the track geometry car which I was responsible for. So, been there, seen that, and
            now it just looks right-----.

            A few hundred meters further into the left side of the loop I have removed a 10m track piece so
            as to avoid loop issues that MSTS does not like. Once it is released a user can easily replace
            this piece, and another at the Kingston Steam plant if they wish - and at their own risk. The
            CSX units are "leased" by NS-----. I need a few more details for the mine too. This was not a
            shaft mine and most of the coal was trucked to this point from stripping locations up to 5
            miles away.

            J. H. Sullivan
            (landnrailroader)[ATTACH=CONFIG]83449[/ATTACH]
            Looking good!

            Comment


              #7
              Fonde, KY & Straight Creek (TN) mines

              Fonde, KY is at the extreme end of the Clear Fork branch which was started by the L&N around 1912 and then sold to the Southern Rwy. who completed it with L&N retaining trackage rights. The mine there is long gone but it's location is indicated on older Topo. maps and I have placed a 3-bay tipple there with conveyors to either side of the narrow valley.

              On Straight Creek, a few miles away, in Tennessee, Kopper Glo operated a modern prep. plant with a long conveyor going to a
              loadout roughly 1/2 mile away. This mine was the last operating coal mine in the state of Tennessee and closed in mid-2019. Coal was brought in from nearby strip operations by truck and then the coal was processed and put in ground storage until ready to load
              what was probably a unit train.

              J. H. Sullivan
              Docent-C&TS RRClick image for larger version

Name:	fonde_mine.JPG
Views:	1
Size:	88.8 KB
ID:	2204199Click image for larger version

Name:	KOPPER-GLO.JPG
Views:	1
Size:	129.8 KB
ID:	2204200

              Comment


                #8
                Isn't Corbin to Etowah one of the routes from Trainmaster 3? Will be following this with interest and once released think I will be dusting off MSTS/OR to give it a try.
                Vern.

                Comment


                  #9
                  Vern,

                  If you are referring to the very early simulation, way before MSTS or others were done, I believe you are correct as I
                  have it and remember running that very early sim. on Win-95 or something like that.

                  J. H. Sullivan

                  Comment


                    #10
                    I had a request from a colleague to do the north end of the AGS (NS) line from Birmingham to Chattanooga and I have
                    completed the track for this route. I went a bit over board in Chattanooga as I plan to use that group of world files
                    in a planned simulation of the NC&StL (L&N, CSX) "J" line. I've put it on the shelf for a while and have started back
                    to detailing the KD route.

                    J. H. Sullivan, P.E. (retired from CSX, SR)
                    Docent C&TS RR (probably retired from that too)

                    Comment


                      #11
                      ARCO Unit Train

                      Colleagues,

                      In the days of the ARCO train, 1967-1992 or so, Jellico was a crew change point where the main line
                      crew traded off to a mine run crew that would take the train to the loading point & return. So here
                      we have the loaded train passing Jellico, and then entering the 7th of 7 tunnels on the line. The
                      first is Pioneer located at the top of the ridge between the Clinch River water shed and the Clear
                      Fork water shed. 5 short tunnels are along the ridge between Pioneer & near the bottom of the
                      grade, with this 7th tunnel being in a gorge of Elk Fork Creek.Click image for larger version

Name:	JELLICO_02.jpg
Views:	1
Size:	191.5 KB
ID:	2204452Click image for larger version

Name:	JELLICO_01.jpg
Views:	1
Size:	164.9 KB
ID:	2204451Click image for larger version

Name:	JELLICO_03.jpg
Views:	1
Size:	195.8 KB
ID:	2204453

                      Comment

                      Working...
                      X