I finally made an actual activity for the route so far where it is completed for the most part.
507-b (not sure the actual crew from Lloyd or EDM does this), lifts Altex Transload Departure Track #3 near Lashburn, Sask.
Heading west to Aberfeldy Track 1 for future Q411 pickup.
altex1 by CN Edmonton, on Flickr
altex3 by CN Edmonton, on Flickr
altex2 by CN Edmonton, on Flickr
But when I cut the cars off in Aber. The engines cannot release brakes. BC pressure sits at 64 or 70 psi. Go figure.
507-b (not sure the actual crew from Lloyd or EDM does this), lifts Altex Transload Departure Track #3 near Lashburn, Sask.
Heading west to Aberfeldy Track 1 for future Q411 pickup.
altex1 by CN Edmonton, on Flickr
altex3 by CN Edmonton, on Flickr
altex2 by CN Edmonton, on Flickr
But when I cut the cars off in Aber. The engines cannot release brakes. BC pressure sits at 64 or 70 psi. Go figure.
Comment