The Tennessee Central was owned by the Southern & the Illinois Central in the early 20th century.
The Illinois Central shared the small yard along the river with the Southern and that is why the...
Type: Posts; User: landnrailroader
The Tennessee Central was owned by the Southern & the Illinois Central in the early 20th century.
The Illinois Central shared the small yard along the river with the Southern and that is why the...
I Decided that "tracks only" would not be sufficient so I am working on the Nashville
Terminal and are adding all roads that intersect tracks by whatever method. Since
Nashville is on several...
Travis just uploaded this signal set based on the 1989 Seaboard System rules.
I retired from CSX in 2001, having worked for Chessie System/CSX since the
fall of 1980. CSX adopted the Seaboard...
Thanks Paul. I found what I needed after further study. hwy3l2wlst40m_left, or ------ right will do it.
These two shapes are sorta like a flat cone with 3 lanes on one end and 2 lanes on the...
Colleagues,
Is there a road section to transition from 3 lanes to two lanes? The situation
is that I am filling in the roads for the Nashville, TN terminal area of the L&N
(CSX). 4th Ave. S....
Cade,
If you find reliable DEMs that will work with DEMEX or whatever your extraction tool is,
then my recommendation is to fill a DVD or two with all the DEMs you think you will
ever need. ...
Colleagues,
I have completed sufficient lines in Louisville, with the L&N Strawberry (or Osbourne-CSX) yard
and a facility in west Louisville on the Paducah & Louisville that services a large...
Colleagues,
Some of you may wonder about this "Mainstem" name. The L&N line from Louisville to Nashville is where it all
got started in the early 1850s. This line is probably better known today...
Colleagues,
I have started on the tracks for the L&N MainStem route, and I start at the
south end of the former PRR bridge over the Ohio R. At around mile 4.5
we come to Osbourne Yard (L&N)...
Colleagues,
Some of you have expressed desire for the L&N Mainline, Louisville to Nashville,
and so that will be the next route to start. I have it digitized, and I have a good
rendering of...
Rick,
I have just started on that route, in parallel with completing the track for the
Eastern Ky Division of L&N (Subdivision of CSX). I have extended the L&N
up to the former PRR bridge over...
I expect to upload the route later today, so it should appear in the library in a few
days. Three issues have been noted, only one of which is the fault of the route
i.e. ME.
A few minor bugs...
A few minor bugs have been found that should not affect use of the
route.
1. If you open the route in RE, there are two shapes that are in the
.ref file but not found in the route. Just...
I expect to upload the route to T-S on Dec. 23 or 24. Currently I have sent the zip file that
will be uploaded to the other individual that started this route so be sure that someone else
can...
Name of Route: KD Subdivision (kdsubdivision)
Version and Release Date: Version 1, Late December 2020
Description: The former L&N line from Corbin, KY to Knoxville, TN, including
...
My KD Subdivision (CSX, or Division - L&N) should be released by years end. I have almost all
spawners in place, and as a last touch, I will record command voice for the 5 Defect Detectors.
In...
I continued to have the problem which in most cases was cleared by moving the exit
signals further from the fouling point. Then I looked this issue up again in the
Route Design forum and there are...
Colleagues,
Does anyone know where this freeware program can be found. The original
download location is no longer viable.
I will be upgrading to Win-10 soon and the original payware version...
I only use TSRE for a few things because there has been no good instruction manual or document for it. I have all the
tips & tricks as well as the daily comments from ElvasTower but there are too...
I was the creator of the four subdivisions that make up those routes and this is the first
time anyone has reported any kind of a road problem. In the beginning I probably did
not use NewRoads,...
i tried that and got the same results, so I just created the bridges from scratch, as I had the
dimensions, and voila, things worked. I had seen this before, once, while detailing out the ...
It turned out to not be quite the solution. Whether or not the end activity occurred depended on the speed at which the
train approached the signal which was at clear, or literally diverging clear....
I think I found the problem. I was starting the activity about a car length prior to the
offending signal which would display green until I got to it, and then switch to red.
I moved the start...
Colleagues,
I am putting the finishing touches on my Corbin-Knoxville route and was adding signals.
I am using pretty much the default signal scripts with searchlight signals which would
have...
Travis,
You have produced some of the best looking signals of various types
I have seen, and I would like to use your NS and CSX signals but I prefer that
my routes be usable in either MSTS or...