Search:

Type: Posts; User: gusthegator

Page 1 of 6 1 2 3 4

Search: Search took 0.00 seconds.

  1. Replies
    43
    Views
    6,864

    Another small update: Speeds are finished up...

    Another small update:

    Speeds are finished up to Back Bay Station. I've been debating how to build Boston South since some track pieces are a bit larger than expected. Once that is finished, I...
  2. Replies
    43
    Views
    6,864

    Replying to my own thread a lot, but I do want to...

    Replying to my own thread a lot, but I do want to keep you all informed. Here is a showcase of Secaucus Junction. This is the third and final rendition and took 4 hours to make using around 150 track...
  3. Replies
    43
    Views
    6,864

    Much later down the line. For now I want to...

    Much later down the line. For now I want to finish the NEC along with the metro north lines.
  4. Replies
    43
    Views
    6,864

    Small Update for those interested: -Going to...

    Small Update for those interested:

    -Going to start and finish track work Providence to Boston South Station. After that, I may try to rework Newark Penn.
    -After a 19 hour grind over 5 days, I...
  5. Replies
    9
    Views
    1,461

    New Haven Union Station connected with PRRv2. ...

    New Haven Union Station connected with PRRv2.
    https://thumbs2.imgbox.com/e3/ea/O3M4VGT8_t.png
  6. Replies
    43
    Views
    6,864

    I'm not removing it since it is connected to the...

    I'm not removing it since it is connected to the yard tracks and not the main track.

    As far as the station placements in the previous post. I used gps visualizer (link is in tsre5 guide book) to...
  7. Replies
    43
    Views
    6,864

    Slope is on point, but I will get started on a...

    Slope is on point, but I will get started on a much needed Newark Penn revamp in February.
  8. Replies
    43
    Views
    6,864

    Best I could do. Red bank platforms are pretty...

    Best I could do. Red bank platforms are pretty much the standard for any njt station.
    78366
  9. Replies
    43
    Views
    6,864

    You read that wrong. I do want to release this at...

    You read that wrong. I do want to release this at somepoint, but I'd like to not get banned because of an ownership or trademark issue as eolesen stated.
  10. Replies
    43
    Views
    6,864

    NewCarrolton: 78344 Seabrook: 78345 ...

    NewCarrolton:
    78344

    Seabrook:
    78345

    Bowie:
    78346

    Odenton:
  11. Replies
    43
    Views
    6,864

    Secaucus Junction: 78333 78334 78335 Newark...

    Secaucus Junction:
    78333
    78334
    78335

    Newark Liberty International:
    78336
    78337
  12. Replies
    43
    Views
    6,864

    As of now, I wouldn't even release the route if I...

    As of now, I wouldn't even release the route if I could.
  13. Replies
    43
    Views
    6,864

    Track charts at a later time. For now, I want to...

    Track charts at a later time. For now, I want to focus on track speeds. Speeds between New Haven/Providence are done as per Timetable No.7
  14. Replies
    43
    Views
    6,864

    As of now, it looks like the 2005+ era. For now,...

    As of now, it looks like the 2005+ era. For now, the speeds between NYP and New Rochelle/Haven would be much good to have.
  15. Replies
    43
    Views
    6,864

    I'll add the track work so that others can modify...

    I'll add the track work so that others can modify it to fit the 1950's but I'm a bit more familiar with the 2005+
  16. Replies
    43
    Views
    6,864

    I do not have track charts. I used satilite...

    I do not have track charts. I used satilite images from google maps and gpx files and took what I could from both to lay the track down as close as possible to real life. My OCD may have kicked in a...
  17. Replies
    43
    Views
    6,864

    Possibly

    Possibly
  18. Replies
    43
    Views
    6,864

    It's a secret, but lets just say I run my acelas...

    It's a secret, but lets just say I run my acelas at 150mph.
  19. Replies
    43
    Views
    6,864

    PRR is getting lengthy

    Two weeks of track work nearly done.
    78238
  20. Replies
    4
    Views
    850

    Much easier than placing individual track speeds....

    Much easier than placing individual track speeds. Thanks for the heads up.
  21. Replies
    4
    Views
    850

    Speed Sign Expand Bug

    Noticed this while replacing some speeds along the Northeast Corridor.

    Some speeds read ask kmph even when they are set to mph (miles in drop box) for both tracks. Here is a 75mph expanded to 2...
  22. Replies
    5
    Views
    928

    Bookmarked links, time for more practice.

    Bookmarked links, time for more practice.
  23. Replies
    5
    Views
    928

    Xtracks with the 3.21 update plus some Scale Rail...

    Xtracks with the 3.21 update plus some Scale Rail for good measure. I'll give it a go tonight and pay a bit more attention to the numbering/lettering system.
  24. Replies
    5
    Views
    928

    Matching Crossovers and Junctions

    Finally started working on a proper secaucus junction for the prr. Was wondering if anyone can lead me to a track guide for how to find the right pieces for crossovers and complex junctions( aka...
  25. Replies
    4
    Views
    1,266

    I'll shoot for 80% then. Unfortunately route...

    I'll shoot for 80% then. Unfortunately route riter has been rather goofy for me. I'll stick with the geo tool feature on goku's editor.
Results 1 to 25 of 132
Page 1 of 6 1 2 3 4