Need a few more beta testers for this soon to be released Metro North New Haven Upgrade would be quite helpful. Send me a PM if you are interested.
Type: Posts; User: gusthegator
Need a few more beta testers for this soon to be released Metro North New Haven Upgrade would be quite helpful. Send me a PM if you are interested.
That explains why some signals never showed. I've looked over my sigdat files more closely. Many errors have been fixed since then. Keep up the good work on this editor Goku.
Before this fix, executable version 0.6952 bypassed those sigdat errors and signals loaded in properly. Until I saw this forum post. That was a goto for editing signals on the PRR. Thought outdated...
The track between NYP and Sunnyside will be changed. 5.2% grade that exists is quite silly. going to reduce it to a hopefully constant 2 or 3%80639
Big-ish Update,
Happy to annouce I got the greenlight to release this route upon completion. 2/3 of GCT has been completed with the station to be finished within the coming weeks. Once GCT is...
If anyone is willing to create these, I'd love to see them. Even a repaint of the M2's would be fine.
Been practicing scenery and track on this route for many months leading up too the NEC build. Making New York City feel a bit more like a city.
80498
Helped out alot. The highlighted sections will make this easier. I honestly couldnt tell where the NEC tracks where via google maps.....Looks like I'll do this yard piece by piece after NYP is...
A track diagram for ZOO Interlocking and Sunnyside Yard would very useful. I may take a trip up to the big apple myself and try to get a good idea of how Sunnyside looks. Sunnyside is going to take...
A long hiadus yes. I have been slacking. Starting November, track work resumes. NYP will be finished and the NEC track/yard portion of Sunnyside will be done. Then the long haul up Metro North...
Finished today.
80480
Work on the NEC will commence in November. NYP has been giving me nightmares so I took off for a bit. For now I wanted to run some Metro North. I upgraded the route a tiny bit. I wanted to go to...
Probably not for a while. Boston comes first. Then the yards a long the way.
Not sure I'll even get to the scenery. Still got a ways to go.
For anyone curious how the route looks, here is a teaser of NYP:
https://www.youtube.com/watch?v=P6jqCSLJ3Ho
Tiny Update:
Distracting my self with some yard work. Only spending around 1 hour a day since it has been nice outside. Here is a partial Wilmington Shops.
79865
Small Update:
Been practicing with track on the Metro North New Haven Route. Just seeing what fits with what. Good news is I have a potential 3 rain days coming up, 2 which happen on my days off....
At this rate, I'll probably leave the scenery to the community. Era swap would be a cool feature like the Monon Route has allowing for the early 2000's open pit to the 2017+ closed pit.
Got a bit lazy the past few weeks. Front half is finished except for West Side Yard and a few station end tracks. The back half is just beginning. Take a look.79764
Boston/Springfield are going to happen. I've got to start and finish work on Zoo int and 30th before I begin work on the Keystone Corridor. I'll post some stuff after each editing session.
Update:
With lock down easing up, my computer time will be less. I will do editing once a week for 3/4 hours on what ever day off I get. Yes this slows things down, but I actually intended to...
Tanks a bunch.
Focus isn't my strong point. Almost stopped at philly to build up more SEPTA Lines. Could've done Airport/Elwyn lines since they are quite simple. But yes, time to stay focused.
Small update:
After much hair pulling, 1/3 of nyp is finished. It will be a bit larger than anticipated, but oddly enough it should be around the same size as the NYP on the Metro North New Haven...
I downloaded pic and bookmarked the site. Really nice info on the % grades not to mention many railroads back in the day.
This helps with the area names. I'll use this in once I start adding some of the yards around newark/secaucus.