ATSF Gallup Sub


Version 1.0 - September 8, 2006

Description
Has over 270 Route Miles of double track running over
the Continental Divide from Belen NM to Winslow AZ.
Also includes the Apache Ry and six other branch lines.
There are numerous Coal Mines and Power Plants for
switching opportunities. Many have turnaround loops.

Major Yards: Winslow, Ft Defiance Arsenal, Holbrook, Gallup,
Grants and Belen.
Junctions: Holbrook - Apache Ry.
Highest point 7,250 ft @ Continental Divide.
Lowest point 4.800 ft @ Rio Grande River - Belen NM.
Amtrak Stops: Winslow, Holbrook, Gallup and Grants.


Install: Copy 6 folders into your routes folder - Run a bat file.


Download: 200 MB


Size of Installed Route: 900 MB


Prototypical Route


Freight and Passenger Route


Era: 1951 to 1981


Location: Northern Arizona and New Mexico USA


Length of Mainline: 270 miles


Number of Branches: 7

Number of Sidings: 28


Number of Yards: 6

Mainline: All Double Track


Level of Trackside Detail:
Has Signals, Milepost, Crossing gates, Buildings, Siding and Platform Names.


Amount of Scenery Completed: 100%


Performance: 266 mgh. 512k ram 64k video card - fps = 15 -25
266 mgh. 1024k ram 128k video card - fps = 25 -50

Activities Provided: 7


Non-Default Consists or Rolling Stock Required in Activities: None


Add-In Track Sets: Xtracks ver 3.10 and NewRoads 3.1.Std or better.


Tsection.dat file used: Release (Build 23) or better.


Freeware Route


Known Problems: None


Downloaded From: TrainSim.com