
Originally Posted by
dedwa15237
Since with CSX, theres been a few changes, as the whole Selkirk Branch has new signals.
New signals and since I worked for Conrail back in the 1990’s out of Selkirk, two new control points/interlockings were also put in. The track arrangement in the Rotterdam Industrial Park has completely been changed also.
Here is a pic of one of the automatics (this particular one was located on Track 1 just west of the bridge over the Normanskill Creek / Watervliet Reservoir) before the new CSXT, Darth Vader/hooded signals were installed.
Asus Maximus VI Extreme Intel Z87, Intel Core i7-4770K, Corsair Dominator Platinum 16GB PC3-19200 (2400MHz), EVGA GeForce GTX TITAN SuperClocked, Samsung 840 Pro Series 128GB SSD (Windows 8.1 Pro 64)/Samsung 840 Pro Series 256GB SSD (Programs), CaseLabs Merlin SM8 with Corsair AX1200 PSU