Results 1 to 1 of 1

Thread: ATSF Marceline Sub

  1. #1
    Join Date
    Nov 1999
    Location
    Palm Harbor, Fl
    Posts
    698

    Exclamation ATSF Marceline Sub

    Name of Route: ATSF Marceline Sub

    Version and Release Date: Version 1 - 9/14/15

    Description: Runs from Ft Madison IA to Kansas City. Includes the Argentine Hump Yard.

    Installation Method: Run an Installer.

    Size of Download: 243 MB

    Size of Installed Route: 771 MB

    Prototypical or Freelance Operations; Mainline, Branch, Switching: Prototype Mainline Switching

    Freight or Passenger: Both

    Era or Genre: 1950 - 1990

    Location: Iowa, Missouri and Kansas

    Length of Mainline: 235 miles

    Length of Branches: 0

    Number of Branches: 0

    Number of Sidings: 25

    Number of Yards: 5

    Mixture of Dual and Single Track: All double track except for bridge over Missouri River at Sibley, which is single track.

    Level of Trackside Detail: Complete

    Percentage of Scenery Completed: % 100%

    FPS Specs, with qualifiers: Urban (KC and Hump Yard) 15-25 fps: Other 25 + fps: - Win 7 - 8 GB Ram

    Activities Provided: 5 Simplistic.

    Non-Default Consists or Rolling Stock Required in Activities: None

    Add-In Track Sets: None

    Xtracks Required?, Version: Yes - Build 38

    Newroads Required?, Version: Yes - Build 38

    Tsection.dat Build: Build 38

    Payware or Freeware: Custom objects restricted use. Freeware - Can not be redistributed.

    URL for More Information and Screenshots:

    Known Problems: None

    Where it can be downloaded: trainsim.com

    Extra information: Download name: Marcie.com

    Designer's e-mail for more info: RobertWirth (at) msn (dot) com
    Last edited by Nels_Anderson; 09-15-2015 at 01:17 PM.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •