    Hello to all...

    I have a question.. what is the best and fast way to add All mile post (in my case Kilometer post) to the full route using TSRE... ????

    I will appreciate suggestions

    Thanks and regards

    Enviado desde mi SM-A720F mediante Tapatalk

  2. #92
    Join Date
    Jun 2013
    Location
    Minnesota
    Posts
    1,280

    Default

    The method I use is to use a ruler to measure how far between mileposts. In the TSRE Tools menu of the Objects window is a built-in ruler function. When measuring mileposts in Real-World routes, use the Geo length rather than game length. It's remarkably fast to measure out 1600 meters (or in your case, 1000), place a milepost, and move on to the next. I did 90 miles of mileposts and signals in an hour and a half. Make sure you delete the ruler objects when you're done. OR won't necessarily choke on them, but they will create errors in the log file if left

  3. #93
    Join Date
    Dec 2008
    Location
    Aguascalientes, Mexico
    Posts
    359

    Default

    Thanks a lot for the information Travis...

    Ok understood... I will be doing that this weekend.. and see how fast I could drive

    Thanks and regards

    Enviado desde mi SM-A720F mediante Tapatalk

  4. #94
    Join Date
    Aug 2008
    Location
    Wyandotte, Michigan, USA
    Posts
    356

    Default

    Max Placing Radius

    Did you plan on having your railroad grade crossing span every track in a wide area, but the orange cubes don't cover all of them? Do you want to make sure one railroad line's mileposts doesn't cover a parallel line that uses a different milepost measurement?

    This is where the Max Placing Radius box comes into function. By default, it's set at 30. For the purpose of this tip, the Max Placing Radius function and it's text box are highlighted in red.

    Here, we are attempting to place a railroad crossing gate at a wide multi-track crossing. Notice that the two furthest tracks aren't covered.


    Click on the text box below the Max Placing Radius text and change the value to an appropriate number. For this example we've changed the Max Placing Radius to 50 and this allows each track served by the crossing to be covered by the orange box.


    This little function should allow you to have proper massive-sized crossings and limited-track-reach mileposts, among other things.

  5. #95
    Join Date
    Jan 2006
    Location
    Hanover Park, Il., USA.
    Posts
    9,074

    Default

    That's cool, thanks!
    Neil

    Here at home, in the railroad mayhem capital of the world.

  6. #96

    Default

    Do you guys have any tips regarding catenary placement? How many meters do set the auto placement to? And how do you avoid duplicate poles being placed over existing ones? I thought doing an auto placement on a new tile would prevent that, but it still add poles on top of existing ones on the neighbour tile.