Page 2 of 2 FirstFirst 12
Results 11 to 16 of 16

Thread: CN Northern Minnesota Route Project

  1. #11

    Default

    Let me know if you want to reuse some of my ore docks or other items that were built for Packerland... I also have a model of a Great Lakes ore hauler which would be appropriate for anything from the 1950's forward...

  2. #12

    Default




  3. #13
    Join Date
    Jun 2013
    Location
    Minnesota
    Posts
    1,128

    Default

    Quote Originally Posted by eolesen View Post
    Let me know if you want to reuse some of my ore docks or other items that were built for Packerland... I also have a model of a Great Lakes ore hauler which would be appropriate for anything from the 1950's forward...
    Sure, I'll use them. It saves me the trouble of having to make a few ore docks for Duluth and Two Harbors

  4. #14

    Default

    PM me the dimensions you need... this could easily be modded into a concrete dock if the trestle style doesn't fit your era.

  5. #15
    Join Date
    Jul 2007
    Location
    .
    Posts
    20

    Default

    ebnertra000 - will this include the North Shore Scenic Railroad from Duluth to Two Harbour? Rode that last fall and quite enjoyed it.

    Bert

  6. #16
    Join Date
    Jun 2013
    Location
    Minnesota
    Posts
    1,128

    Default

    Quote Originally Posted by bertwise View Post
    ebnertra000 - will this include the North Shore Scenic Railroad from Duluth to Two Harbour? Rode that last fall and quite enjoyed it.

    Bert
    No, someone else has that included in their route project

    https://www.trainsim.com/vbts/showth...icago-Mainline

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •