Page 14 of 14 FirstFirst ... 4121314
Results 131 to 137 of 137

Thread: Route - Mexico City - Veracruz "FCM railroad"

  1. #131
    Join Date
    Dec 2008
    Location
    Aguascalientes, Mexico
    Posts
    220

    Default

    Hello friends,

    I appreciate the recognition about the route.. it's very glad to receive that words!!

    I hope to be sharing this work with the all of you very soon...

    Here is the real picture of the area that I am working on "Pensil Tunnel-Viaduct-Bridge"

    Regards

    Enviado desde mi SM-A720F mediante Tapatalk

  2. #132

    Default

    Damn dude. Hard to believe that is still the same MSTS from 18 years ago. That bridge into the tunnel looks amazing. Keep up the good work!

  3. #133
    Join Date
    Dec 2008
    Location
    Aguascalientes, Mexico
    Posts
    220

    Default

    Quote Originally Posted by jasonjedi1 View Post
    Damn dude. Hard to believe that is still the same MSTS from 18 years ago. That bridge into the tunnel looks amazing. Keep up the good work!
    Hello Jason,

    I would like to share this video to show this interesting Tunnel-Viaduct-Bridge "Pensil"

    https://youtu.be/qCGgY4djOmc

    Based in the construction of the tunnel it looks that original plan or intention was to placedouble track...

    Regards


    Enviado desde mi SM-A720F mediante Tapatalk

  4. #134
    Join Date
    May 2010
    Location
    Pacific Time
    Posts
    876

    Default

    Catenary looks great! Now there's a place to run those E60s in the file library...

  5. #135
    Join Date
    Feb 2005
    Location
    belo horizonte, minas gerais, brasil
    Posts
    242

    Default

    without making haste at work. Will the tunnel be with animated doors?


    Regards[IMG]
    Chimbica Dash8

  6. #136
    Join Date
    Dec 2008
    Location
    Aguascalientes, Mexico
    Posts
    220

    Default

    Quote Originally Posted by mikeebb View Post
    Catenary looks great! Now there's a place to run those E60s in the file library...
    Hello Mike,

    Yes for now there are around 45 kms (around 30 miles) to run the E60S... I am going to use the section of this route to create a future route from to Irapuato that will have all electrified lines (Juarez-Morelos)... But there is still a lot of work to complete this route...

    Saludos from Ventura, California (here visiting the area and enjoying to watch the surfliner passing very fast!!)

    Regards

    Enviado desde mi SM-A720F mediante Tapatalk

  7. #137
    Join Date
    Dec 2008
    Location
    Aguascalientes, Mexico
    Posts
    220

    Default

    Quote Originally Posted by anderson martins View Post
    without making haste at work. Will the tunnel be with animated doors?


    Regards[IMG]
    Hi,

    That would be a excellent plan for which I would need to study to determine how programming the opening and closing process of an animated object...

    At least I am very happy due I am working in the area that was abandoned for a while (the last 100 kms to complete the route)

    Regards!!

    Enviado desde mi SM-A720F mediante Tapatalk

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •