Saving Boston/Springfield and Keystone Corridor for another time, or that's it?
Saving Boston/Springfield and Keystone Corridor for another time, or that's it?
Redefined for better content craftsmanship.
Got a bit lazy the past few weeks. Front half is finished except for West Side Yard and a few station end tracks. The back half is just beginning. Take a look.Contrib.TrackViewer 2020-07-10 20-21-21-090.jpg
Last edited by gusthegator; 07-10-2020 at 09:23 PM. Reason: bad pic size
Oh and can we have the "pit" open? As in the big area where one could see the railroad down below (Please don't cover it up unlike what they did in real life)
Small Update:
Been practicing with track on the Metro North New Haven Route. Just seeing what fits with what. Good news is I have a potential 3 rain days coming up, 2 which happen on my days off. I can finish NYP in one go and possibly build out to New Rochelle. Sunny side will be pretty terrible so don't expect much.
Good stuff there. I have a YouTube link of the proposed east Bronx metro north stops if you'd like to take a look. I just rebuilt the entire Hellgate line to accommodate. Keep up the great work! 👍👍👍
https://youtu.be/8gwyEboXoOs
https://youtu.be/txruATPx6Uw
Cory Duguid
US NAVY VET