NEC in Progress
gusthegator
Good luck on yourt work with the NEC............Vince did a great job in starting to straighten out Zoo Jct which was so goofed up in the PRR Eastern region original.
Since the route is set in the 1950's......there are still a number of errors that need to be eliminated:
1) Upper Level of 30th street station is totally wrong. The east end (Schuylkill Interlocking) where it crosses the Delaware should be a 4 track mainline becoming a 6 track station. The west end of 30th street has the Media/West Chester line totally wrong...it should be a "duck under" the two westbound tracks from the Trenton/Paoli mainlines. Also, Powellton Avenue (MU storage for Suburban Station) is totally missing.
2) Suburban Station (BROAD Interlocking) should be a EIGHT track (#0-7) station, platform placement between tracks is wrong
3) Penn Station NY is missing quite a number of tracks..(#1-21) and all the switch arrangements at C, JO, KN and A towers is wrong and mis-leading, platform placement between tracks is also totally wrong
4) Since Sunnyside Yard is in the 1950's theme...there should be A LOT MORE tracks in the main yard..(#1-68) all through tracks except 64-68 (stub end)from R to Q towers....also the REA PXT tracks (96-73 and 101-106) which was the "stub end" of track 68.....are also missing, as well as Gozman Avenue Yard (tracks A-E) off of Loop A at R tower is missing.
5) The grade separation between the East River tunnels going east to F, HAROLD towers and Woodside station is also cockeyed and does not match reality
If you need track and interlocking diagrams, I have many from that and Philadelphia areas to assist
Doug
Happiness is when the AI-trains appear where you want them to