Page 7 of 8 FirstFirst ... 5678 LastLast
Results 61 to 70 of 74

Thread: NEC in progress

  1. #61
    Join Date
    May 2011
    Location
    Tokyo, Washington D.C., Ottowa, QC
    Posts
    494

    Default

    Saving Boston/Springfield and Keystone Corridor for another time, or that's it?
    Redefined for better content craftsmanship.

  2. #62

    Default

    Quote Originally Posted by J.A.V. View Post
    Saving Boston/Springfield and Keystone Corridor for another time, or that's it?
    Boston/Springfield are going to happen. I've got to start and finish work on Zoo int and 30th before I begin work on the Keystone Corridor. I'll post some stuff after each editing session.

  3. #63

    Default

    Got a bit lazy the past few weeks. Front half is finished except for West Side Yard and a few station end tracks. The back half is just beginning. Take a look.Contrib.TrackViewer 2020-07-10 20-21-21-090.jpg
    Last edited by gusthegator; 07-10-2020 at 08:23 PM. Reason: bad pic size

  4. #64
    Join Date
    Jun 2020
    Location
    The Grand Canyon State
    Posts
    48

    Default

    Oh and can we have the "pit" open? As in the big area where one could see the railroad down below (Please don't cover it up unlike what they did in real life)

  5. #65

    Default

    Quote Originally Posted by USASpiritlineTrains View Post
    Oh and can we have the "pit" open? As in the big area where one could see the railroad down below (Please don't cover it up unlike what they did in real life)
    At this rate, I'll probably leave the scenery to the community. Era swap would be a cool feature like the Monon Route has allowing for the early 2000's open pit to the 2017+ closed pit.

  6. #66

    Default

    Small Update:

    Been practicing with track on the Metro North New Haven Route. Just seeing what fits with what. Good news is I have a potential 3 rain days coming up, 2 which happen on my days off. I can finish NYP in one go and possibly build out to New Rochelle. Sunny side will be pretty terrible so don't expect much.

  7. #67
    Join Date
    Jan 2008
    Location
    Manassas, VA
    Posts
    1,328

    Default

    Good stuff there. I have a YouTube link of the proposed east Bronx metro north stops if you'd like to take a look. I just rebuilt the entire Hellgate line to accommodate. Keep up the great work! 👍👍👍
    https://youtu.be/8gwyEboXoOs
    https://youtu.be/txruATPx6Uw
    https://www.trainsim.com/vbts/signaturepics/sigpic75077_5.gif
    Cory Duguid
    US NAVY

  8. #68
    Join Date
    Jun 2020
    Location
    The Grand Canyon State
    Posts
    48

    Default

    Quote Originally Posted by captain82 View Post
    I've just rebuilt the entire Hellgate line to accommodate.
    Well speak of the Devil, looks like there really is going to be a Full NEC!
    Also as for crew changes, where did crews normally change on the NEC.

  9. #69
    Join Date
    Jan 2008
    Location
    Manassas, VA
    Posts
    1,328

    Default

    Quote Originally Posted by USASpiritlineTrains View Post
    Well speak of the Devil, looks like there really is going to be a Full NEC!
    Also as for crew changes, where did crews normally change on the NEC.
    Well his is the entire NEC whereas mine is just strictly Metro-North. We just happen to both be working the same corner. 🤣🤣🤣
    https://www.trainsim.com/vbts/signaturepics/sigpic75077_5.gif
    Cory Duguid
    US NAVY

  10. #70
    Join Date
    Jun 2020
    Location
    The Grand Canyon State
    Posts
    48

    Default

    Quote Originally Posted by captain82 View Post
    Well his is the entire NEC whereas mine is just strictly Metro-North. We just happen to both be working the same corner. 🤣🤣🤣
    So in a route merge, would you want yours or his to be added into. If yours is added, I am aware that we will have a Metro North Extension.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •