I updated my route to add a yard. There is double track leading to a facing point crossover then immediately after the crossover is a switch into the yard lead. The track all went together fine but when I try to create a path using the ORTS path viewer through the 2 back to back switches starting from one of the yard tracks, the path refuses to go through the switches.
Is there some issue with creating back to back switches? Do I need to have a short section of track between them?
Here is what it looks like in TSRE
pathproblem.jpg
and in track viewer:
pathprobTrkView.jpg
When I try to advance the path past the switch node, it refuses to budge.