Page 3 of 4 FirstFirst 1234 LastLast
Results 21 to 30 of 32

Thread: Route - Ferrocarril Chihuahua al Pacífico (Chepe)

  1. #21
    Join Date
    Jul 2005
    Location
    Sandwich, Illinois, USA.
    Posts
    167

    Default

    I'm speechless...WOW
    Kevin Kelleher

  2. #22
    Join Date
    Dec 2012
    Location
    Netherlands
    Posts
    47

    Default

    Very impressive!

    Wim

  3. #23
    Join Date
    Dec 2008
    Location
    Aguascalientes, Mexico
    Posts
    420

    Default

    Route Completed (1 of 2 phases)

    1st phase: 385 KMS of 653 KMS - high mountain area from Los Mochis to Creel - 6 months of intensive work, requiring additional skills for working with terrain, just pressing F to adjust tracks to terrain wouldn't work to create all tunels, bridges, loops, double and triple track levels just like Temoris area, but it was very interesting!

    Los Mochis, Sinaloa
    https://maps.app.goo.gl/8LtePrPtHEJebfdGA

    Creel, Chihuahua (State)
    https://maps.app.goo.gl/fCwfUmQCh8fjPt6p8

    These week we are doing a full route testing,

    Next year I will plan to continue with phase 2, Creel to Chihuahua (City),

    Thanks

    Rodrigoville





    Enviado desde mi SM-A720F mediante Tapatalk
    Last edited by rodrigoville; 10-27-2021 at 03:12 PM.

  4. #24
    Join Date
    Dec 2008
    Location
    Aguascalientes, Mexico
    Posts
    420

    Default

    Some shots of Chepe Route in editor mode (status: completed)

  5. #25
    Join Date
    Dec 2008
    Location
    Aguascalientes, Mexico
    Posts
    420

    Default

    More shots Chepe route (editor mode), from Los Mochis to Creel, México

    Enviado desde mi SM-A720F mediante Tapatalk

  6. #26
    Join Date
    Jan 2006
    Location
    Hanover Park, Il., USA.
    Posts
    9,453

    Default

    Payware quality, no doubt! Very impressive.
    Neil

    Here at home, in the railroad mayhem capital of the world.

  7. #27

    Default

    I have no words how amazing this is. It makes me very happy for all the community.

    Very very impressive. I really hope this project sees the day of release. It is the probably the biggest project in the making to date.
    It will put OR to the real test

    I really hope you finish this. It is, for sure, on my "Must Have" list.

    Have fantastic day

  8. #28
    Join Date
    Dec 2008
    Location
    Aguascalientes, Mexico
    Posts
    420

    Default

    Thanks for the comments about the route,

    The project is planned in two parts Mochis to Creel (385kms) having 80 tunnels of 88 total, (status: completed, Apr 2021 to Oct 2021), then Creel to Chihuahua (268kms) planned for 2022, total route length 653kms, (408miles)

    For this route I have put special attention to create very specific details in bridges, tunnels, stations, terrain, towns, etc...

    Due I am using Google maps for terrain I converted all terrtex to DDS reducing the size from 35GB to 10GBs,

    The challenge was working with terrain to create the 80 tunnels, tunnel + bridge, loops, 3 levels of track close between each other, tunnels cutting the mountain as a wall, following the correct gradient of track according with the real terrain and according to route documentation, designing tunnel portals, bridges, bases, suports, and other specific stuff,

    In real live the route is active, there is a passenger service operated by Ferromex
    https://chepe.mx/

    Thanks



    Enviado desde mi SM-A720F mediante Tapatalk

  9. #29
    Join Date
    May 2010
    Location
    Saskatchewan, CA
    Posts
    922

    Default

    Rodrigoville...you're hired! You should be getting paid well for this project imo!
    Rory

  10. #30
    Join Date
    Mar 2011
    Location
    MP44.2 Worcester, MA
    Posts
    314

    Default

    This route is payware quality.

    I look forward to the completion of the route.

    Fred

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
-->