Results 1 to 9 of 9

Thread: Ontario Northland rail service to resume by 2025

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #1
    metalangel Guest

    Default Ontario Northland rail service to resume by 2025

    https://www.cbc.ca/news/canada/sudbu...2025-1.6039373

    Rail service from Toronto to Cochrane was withdrawn in 2012 in favour of buses, but is now looking set to resume by 2025 with a revitalised service.

    This is proper, rugged rail travel through the Canadian Shield all the way north through Ontario. From Cochrane, another service known as the Polar Bear Express takes you north to Moosonee and James Bay.



    Interesting, for a period in the 1970s and 80s, the Northlander train from Toronto was operating using former TransEuropean Express trains. These were not entirely successful, and the power car was removed and replaced with a more standard EMD FP7.



    Here's how the service was in 2009, you can see why a train would be preferable to a bus for the distances involved:

    Attached Images Attached Images

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
-->