After setting up the work order, I started my day at around 5am at Taft West Yard. I think I got the designation current.
Once assembled, we kick off brakes bound for Waycross. The train had to pickup a cut of autoracks at Sanford and drop them, along with about 15 other cars, at Jacksonville. We were also tasked with picking up a cut there.
I didn't have trouble in Sanford. However, I had trouble getting some cars to uncouple at Moncrief. It took a couple of tries. I also assigned and decided to keep a mid-DUP. In this picture, we are leaving JAX behind and a train runs through. It was a little after 1pm.
Of course, I trip a detect detector close to 2pm. It was a hotbox.
I don't usually take screenshots with the HUD on, but it had been a long trip. Also, I think the HUD replaces feel. You can see on screen what a crew would feel.
11 hours after starting, I arrive at Waycross. I have a GTX 2070 (didn't want to wait for the 3080) and 10th Gen CPU. My heavily populated yard slowed to 40fps, which is fine.
