Page 2 of 2 FirstFirst 12
Results 11 to 17 of 17

Thread: TS2022 Screenshots

  1. #11
    Join Date
    May 2010
    Location
    S.W.WALES
    Posts
    4,481

    Default















    Mike.
    Yma O Hyd

  2. #12
    Join Date
    May 2010
    Location
    S.W.WALES
    Posts
    4,481

    Default

    Manchester - Milford Haven. Shrewsbury to Swansea section.















    Mike.
    Yma O Hyd

  3. #13
    Join Date
    May 2010
    Location
    S.W.WALES
    Posts
    4,481

    Default















    Mike.
    Yma O Hyd

  4. #14
    Join Date
    May 2010
    Location
    S.W.WALES
    Posts
    4,481

    Default

    Glasgow - Fort William - Mallaig, merged route.















    Mike.
    Yma O Hyd

  5. #15
    Join Date
    May 2010
    Location
    S.W.WALES
    Posts
    4,481

    Default











    Mike.
    Yma O Hyd

  6. #16
    Join Date
    May 2010
    Location
    S.W.WALES
    Posts
    4,481

    Default

    North Wales Coast, Crewe - Holyhead. With a stupidly overpowered Class 47 and an example of lazy fence placement. Should be at the top of cuttings and bottom of embankments. But using the track offset tool to run them along the track bed is much easier. In other parts of the route, it is even easier, not to place the fencing at all. Pet peeve sorry, whinge over.



















    Yma O Hyd

  7. #17
    Join Date
    May 2010
    Location
    S.W.WALES
    Posts
    4,481

    Default

    cont................











    Mike.
    Yma O Hyd

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •